Guidelines and Documentation Requirement
General
Applicant must be the registered TPDDL consumer.
Valid ID proof and site ownership proof are mandatory.
Compliance with Domestic Content Requirement (DCR) i.e. Domestic manufactured PV module and MNRE approved list of manufacturers and material (ALMM) is mandatory for release of subsidy.
Only installations by registered vendors on the National Portal are eligible for subsidy.
OTP will be sent to the registered mobile number only.
Post feasibility analysis, TPDDL will inform approval/deficiency via SMS/Email.
solar Plant upto capacity of <=10 KW is Deemed feasible, you are requested to apply after completion of your plant.
In case the applicant opts for customer owned meter, it should comply with the relevant IS 16444 and Tata Power DDL’s meter technical specification that will verified and tested at Keshav Puram LAB or MMG KPM NABL LAB.
Document
Authority letter required if consumer is an institute/company/firm/govt. office/ society/ trust.
NOC format (in case of co-owner RC & Joint property) in formats and annexure section.
TPDDL may request additional documents if needed.
All forms must be completely filled, and scanned copies should be clear.
Safety
PV Module and Inverter datasheet must be of the same capacity.
Solar panels and inverter must be installed at the same premises.
Meter replacement (if required) will be as per solar capacity. Ensure wiring compliance, provide space/support for the meter, and note that cost will be billed later.
Comply with all safety parameters, install ELCB/RCCB (physical & electrical isolation).
Formats & Annxeures
Net Metering Application Form (Required only if there is any deficiency in the online application form)
GNM Connection Agreement
GNM Declaration
VNM Connection Agreement
VNM Declaration
VNM Authority Letter
NOC format (in case of co-owner RC & Joint property)
I have read & accepted all above mentioned terms and conditions of Net Metering application.