The augmentation and maintenance work will be carried out in the areas mentioned below to ensure an uninterrupted power supply and no equipment failure / breakdown. Due to this, the Electricity supply may be affected in the following areas on
1 |
TATA POWER - DDL |
BADLI |
516 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 16:00 |
SEC-26 |
5 |
2 |
TATA POWER - DDL |
BADLI |
516 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 15:00 |
SEC-35 |
4 |
3 |
TATA POWER - DDL |
BADLI |
572 |
PREVENTIVE MAINTENANCE |
23.04.24 10:30 |
23.04.24 13:30 |
PART OF KHEDA KHURD |
3 |
4 |
TATA POWER - DDL |
BAWANA |
512 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 15:00 |
PART OF BAWANA |
4 |
5 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
23.04.24 08:00 |
23.04.24 09:00 |
PART OF O BLK SEC 2 |
1 |
7 |
TATA POWER - DDL |
BAWANA |
521 |
PROJECT WORK |
23.04.24 06:00 |
23.04.24 09:00 |
N BLK SEC 2 |
3 |
8 |
TATA POWER - DDL |
BAWANA |
533 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 15:00 |
PART OF MAHAVIR VIHAR |
4 |
9 |
TATA POWER - DDL |
KESAHAVPURAM |
425 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 14:00 |
PETROL PUMP A-BLK |
3 |
12 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 15:00 |
MUBARAKPUR VILLAGE |
4 |
13 |
TATA POWER - DDL |
MANGOLPURI |
515 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 13:00 |
PART OF F-1 BLK MGP |
2 |
14 |
TATA POWER - DDL |
MANGOLPURI |
515 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 13:00 |
PART OF S BLK |
2 |
15 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 15:00 |
PART OF BUDH VIHAR PH-2 |
4 |
16 |
TATA POWER - DDL |
MODEL TOWN |
402 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 15:00 |
SOME PARTS OF LAL BAGH |
4 |
18 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 15:00 |
PART OF KUSHAK NO-1 |
4 |
19 |
TATA POWER - DDL |
NARELA |
522 |
PREVENTIVE MAINTENANCE |
23.04.24 07:30 |
23.04.24 09:30 |
PART OF E-871 TO E-885 DSIDC |
2 |
20 |
TATA POWER - DDL |
NARELA |
522 |
PREVENTIVE MAINTENANCE |
23.04.24 12:00 |
23.04.24 14:00 |
PART OF C-417 TO C-420 DSIDC |
2 |
21 |
TATA POWER - DDL |
SHALIMARBAGH |
414 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 13:00 |
PART OF KAUSHIK ENCLAVE |
2 |
22 |
TATA POWER - DDL |
SHALIMARBAGH |
503 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 15:00 |
PART OF SWAROOP NAGAR |
4 |
23 |
TATA POWER - DDL |
SHALIMARBAGH |
503 |
PREVENTIVE MAINTENANCE |
23.04.24 11:00 |
23.04.24 15:00 |
PART OF SAMTA VIHAR |
4 |
24 |
TATA POWER - DDL |
SHALIMARBAGH |
532 |
PREVENTIVE MAINTENANCE |
23.04.24 14:00 |
23.04.24 16:00 |
PART OF SANGAM VIHAR |
2 |
25 |
TATA POWER - DDL |
SHALIMARBAGH |
532 |
PREVENTIVE MAINTENANCE |
23.04.24 10:00 |
23.04.24 12:00 |
PART OF WAZIRABAD |
2 |
26 |
TATA POWER - DDL |
SHALIMARBAGH |
532 |
PREVENTIVE MAINTENANCE |
23.04.24 12:30 |
23.04.24 14:00 |
PART OF WAZIRABAD |
2 |
27 |
TATA POWER - DDL |
SHALIMARBAGH |
532 |
PREVENTIVE MAINTENANCE |
23.04.24 14:00 |
23.04.24 16:00 |
PART OF SANGAM VIHAR |
2 |
28 |
TATA POWER - DDL |
BADLI |
507 |
PREVENTIVE MAINTENANCE |
26.04.24 10:00 |
26.04.24 15:00 |
PART OF SIRAS PUR |
5 |
29 |
TATA POWER - DDL |
BADLI |
507 |
PREVENTIVE MAINTENANCE |
27.04.24 10:00 |
27.04.24 13:00 |
PART OF MANDIR MOHALLA |
3 |
30 |
TATA POWER - DDL |
BADLI |
507 |
PREVENTIVE MAINTENANCE |
24.04.24 10:00 |
24.04.24 16:00 |
PART OF RAILWAY ROAD |
6 |
31 |
TATA POWER - DDL |
BADLI |
516 |
PREVENTIVE MAINTENANCE |
01.05.24 11:00 |
01.05.24 15:00 |
SAHABAD |
4 |
32 |
TATA POWER - DDL |
BADLI |
516 |
PREVENTIVE MAINTENANCE |
02.05.24 11:00 |
02.05.24 16:00 |
PRAHLADPUR |
5 |
33 |
TATA POWER - DDL |
BADLI |
516 |
PREVENTIVE MAINTENANCE |
24.04.24 11:00 |
24.04.24 16:00 |
SEC-28 |
5 |
34 |
TATA POWER - DDL |
BADLI |
516 |
PREVENTIVE MAINTENANCE |
25.04.24 11:00 |
25.04.24 16:00 |
SEC-28 |
5 |
35 |
TATA POWER - DDL |
BADLI |
516 |
PREVENTIVE MAINTENANCE |
27.04.24 10:00 |
27.04.24 16:00 |
BADLI |
6 |
36 |
TATA POWER - DDL |
BADLI |
516 |
PREVENTIVE MAINTENANCE |
29.04.24 11:00 |
29.04.24 16:00 |
KRISHNA COLONY |
5 |
37 |
TATA POWER - DDL |
BADLI |
516 |
PREVENTIVE MAINTENANCE |
30.04.24 11:00 |
30.04.24 16:00 |
PRAHLAD VIHAR |
5 |
38 |
TATA POWER - DDL |
BADLI |
516 |
PREVENTIVE MAINTENANCE |
24.04.24 11:00 |
24.04.24 16:00 |
PRAHLADPUR |
5 |
39 |
TATA POWER - DDL |
BADLI |
572 |
PREVENTIVE MAINTENANCE |
25.04.24 10:00 |
25.04.24 16:00 |
PART OF DJB |
6 |
40 |
TATA POWER - DDL |
BADLI |
572 |
PROJECT WORK |
24.04.24 10:30 |
24.04.24 16:30 |
PART OF KHERA KALAN |
6 |
41 |
TATA POWER - DDL |
BADLI |
572 |
PREVENTIVE MAINTENANCE |
26.04.24 10:30 |
26.04.24 16:30 |
PART OF KHERA KALAN |
6 |
42 |
TATA POWER - DDL |
BAWANA |
512 |
PREVENTIVE MAINTENANCE |
29.04.24 10:30 |
29.04.24 14:30 |
PART OF KRISHNA VIHAR |
4 |
43 |
TATA POWER - DDL |
BAWANA |
512 |
PREVENTIVE MAINTENANCE |
30.04.24 10:30 |
30.04.24 14:30 |
PART OF BAJITPUR AGRICULTURE |
4 |
44 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
24.04.24 11:00 |
24.04.24 14:00 |
TUBE WELL LINE |
3 |
45 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
24.04.24 06:00 |
24.04.24 09:00 |
M BLK SEC 3 |
3 |
46 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
25.04.24 06:00 |
25.04.24 09:00 |
M BLK SEC 3 |
3 |
47 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
26.04.24 06:00 |
26.04.24 09:00 |
M BLK SEC3 |
3 |
48 |
TATA POWER - DDL |
BAWANA |
533 |
PREVENTIVE MAINTENANCE |
24.04.24 08:00 |
24.04.24 12:00 |
PART OF TATASER AGRICULTURAL AREA |
4 |
49 |
TATA POWER - DDL |
BAWANA |
533 |
PREVENTIVE MAINTENANCE |
26.04.24 08:00 |
26.04.24 12:00 |
PART OF AGRICULTURAL AREA OF NIZAMPUR VILLAGE |
4 |
50 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
25.04.24 11:00 |
25.04.24 13:00 |
SWISS APRTMENT |
2 |
51 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
24.04.24 14:00 |
24.04.24 16:00 |
SCHOOL |
2 |
52 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
27.04.24 11:00 |
27.04.24 13:00 |
UNDER HILL ROAD |
2 |
53 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
28.04.24 11:00 |
28.04.24 13:00 |
BISHNOI DHARMASHALA , IP COLLEGE |
2 |
54 |
TATA POWER - DDL |
CIVIL LINES |
416 |
PREVENTIVE MAINTENANCE |
25.04.24 10:30 |
25.04.24 12:30 |
RP BAGH |
2 |
55 |
TATA POWER - DDL |
CIVIL LINES |
416 |
PREVENTIVE MAINTENANCE |
25.04.24 14:00 |
25.04.24 16:00 |
KHOSLA |
2 |
56 |
TATA POWER - DDL |
CIVIL LINES |
416 |
PREVENTIVE MAINTENANCE |
25.04.24 11:00 |
25.04.24 13:00 |
POLO GROUND AFFECTED |
2 |
57 |
TATA POWER - DDL |
CIVIL LINES |
416 |
PREVENTIVE MAINTENANCE |
26.04.24 11:00 |
26.04.24 13:00 |
HTC |
2 |
58 |
TATA POWER - DDL |
CIVIL LINES |
418 |
PREVENTIVE MAINTENANCE |
24.04.24 11:00 |
24.04.24 13:00 |
DSE |
2 |
59 |
TATA POWER - DDL |
CIVIL LINES |
418 |
PREVENTIVE MAINTENANCE |
24.04.24 14:00 |
24.04.24 16:00 |
SRI RAM INSTITITE |
2 |
60 |
TATA POWER - DDL |
CIVIL LINES |
423 |
PREVENTIVE MAINTENANCE |
24.04.24 14:00 |
24.04.24 16:00 |
NIL |
2 |
61 |
TATA POWER - DDL |
KESAHAVPURAM |
501 |
PREVENTIVE MAINTENANCE |
24.04.24 11:00 |
24.04.24 15:00 |
PART OF B--BLKIND AREA |
4 |
62 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
27.04.24 11:00 |
27.04.24 15:00 |
GALI NO 4 JAIN NAGAR |
4 |
63 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
26.04.24 11:00 |
26.04.24 15:00 |
GALI NO 3 JAIN NAGAR |
4 |
64 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
29.04.24 11:00 |
29.04.24 15:00 |
UTSAV VIHAR AND SUKHBIR NAGAR |
4 |
65 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
26.04.24 11:00 |
26.04.24 15:00 |
RANIKHERA |
4 |
66 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
25.04.24 11:00 |
25.04.24 15:00 |
GALI NO 4 JAIN NAGAR |
4 |
67 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
24.04.24 11:00 |
24.04.24 15:00 |
RANIKHERA, BHAGYA VIHAR |
4 |
68 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
24.04.24 12:00 |
24.04.24 16:00 |
BHAGYA VIHAR |
4 |
69 |
TATA POWER - DDL |
KIRARI |
523 |
PROJECT WORK |
26.04.24 11:00 |
26.04.24 15:00 |
SOME PART OF PREM NAGAR-1 |
4 |
70 |
TATA POWER - DDL |
MANGOLPURI |
518 |
PROJECT WORK |
26.04.24 11:00 |
26.04.24 15:00 |
RATAN VIHAR PARTIALY AND RICE GODOWN STREET PARTIALY |
4 |
71 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PROJECT WORK |
26.04.24 10:00 |
26.04.24 11:00 |
PART RAJEEV NAGAR HVDS |
1 |
72 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PROJECT WORK |
26.04.24 15:00 |
26.04.24 16:00 |
PART OF HVDS RAJEEV NAGAR |
1 |
73 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
24.04.24 11:00 |
24.04.24 15:00 |
PART OF BUDH VIHAR PH-2 |
4 |
74 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
25.04.24 14:00 |
25.04.24 16:00 |
PART OF SEC-22 RHN |
2 |
75 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
25.04.24 11:00 |
25.04.24 15:00 |
PART OF SEC-22 RHN |
4 |
76 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PROJECT WORK |
26.04.24 11:00 |
26.04.24 15:00 |
PART OF HVDS RAJEEV NAGAR |
4 |
77 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
24.04.24 10:00 |
24.04.24 11:00 |
PART OF PKT-9 SEC-21 |
1 |
78 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PROJECT WORK |
24.04.24 11:00 |
24.04.24 15:00 |
PART OF PKT-9 SEC-21 |
4 |
79 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PROJECT WORK |
26.04.24 12:00 |
26.04.24 14:00 |
PART OF HVDS RAJEEV NAGAR |
2 |
80 |
TATA POWER - DDL |
MODEL TOWN |
402 |
METERING WORK |
24.04.24 11:00 |
24.04.24 13:00 |
PART OF B-BLOCK INDUSTRIAL GTK |
2 |
81 |
TATA POWER - DDL |
MODEL TOWN |
402 |
METERING WORK |
24.04.24 11:00 |
24.04.24 13:00 |
PART OF B-BLOCK INDUSTRIAL GTK |
2 |
82 |
TATA POWER - DDL |
MODEL TOWN |
402 |
METERING WORK |
24.04.24 14:30 |
24.04.24 16:00 |
PART OF B-BLOCK INDUSTRIAL GTK |
2 |
83 |
TATA POWER - DDL |
MODEL TOWN |
402 |
METERING WORK |
26.04.24 11:00 |
26.04.24 13:00 |
PART OF B-BLK. GTK |
2 |
84 |
TATA POWER - DDL |
MODEL TOWN |
505 |
METERING WORK |
24.04.24 10:30 |
24.04.24 12:30 |
PART OF RAMGARH |
2 |
85 |
TATA POWER - DDL |
MODEL TOWN |
505 |
PROJECT WORK |
24.04.24 10:30 |
24.04.24 14:30 |
PART OF D-BLK |
4 |
86 |
TATA POWER - DDL |
MODEL TOWN |
505 |
PROJECT WORK |
24.04.24 10:30 |
24.04.24 14:30 |
PART OF D-BLK |
4 |
87 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
26.04.24 11:00 |
26.04.24 15:00 |
PART OF KUSHAK HIRANKI |
4 |
88 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
24.04.24 11:00 |
24.04.24 15:00 |
PART OF RENNY WELL |
4 |
89 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
25.04.24 11:00 |
25.04.24 15:00 |
PART OF SUNDER VIHAR |
4 |
90 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
25.04.24 12:00 |
25.04.24 14:00 |
PART OF KADI VIHAR D-BLOCK |
2 |
91 |
TATA POWER - DDL |
NARELA |
514 |
PREVENTIVE MAINTENANCE |
24.04.24 11:00 |
24.04.24 15:00 |
SABOLI ROAD , SANAJAY COLONY, |
4 |
92 |
TATA POWER - DDL |
NARELA |
522 |
PREVENTIVE MAINTENANCE |
25.04.24 10:30 |
25.04.24 14:30 |
A5 PKT 6 MARKET DT 250 KVA |
4 |
93 |
TATA POWER - DDL |
NARELA |
522 |
PREVENTIVE MAINTENANCE |
26.04.24 10:30 |
26.04.24 14:30 |
B 2 PKT H |
4 |
94 |
TATA POWER - DDL |
NARELA |
522 |
PREVENTIVE MAINTENANCE |
24.04.24 10:30 |
24.04.24 14:30 |
A 10 PKT 6 |
4 |
95 |
TATA POWER - DDL |
NARELA |
522 |
PREVENTIVE MAINTENANCE |
24.04.24 07:00 |
24.04.24 09:00 |
PART OF D-1501 TO D-1521 & D-1645 TO D-1651 |
2 |
96 |
TATA POWER - DDL |
PITAMPURA |
504 |
PREVENTIVE MAINTENANCE |
24.04.24 10:30 |
24.04.24 14:30 |
SOME PART OF BA BLOCK |
4 |
97 |
TATA POWER - DDL |
SHALIMARBAGH |
503 |
PREVENTIVE MAINTENANCE |
24.04.24 11:00 |
24.04.24 15:00 |
PART OF SSI INDUSRIAL AREA |
4 |