| TATA POWER - DDL Distribution System Outage Request From 03-Nov-2025 To 03-Dec-2025 |
| S. No |
Discom |
Distt |
Zone |
DESCRIPTION |
Date Time from |
Date Time to |
Area affected |
Total Duration (in Hrs) |
| 1 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
02.11.25 11:00 |
02.11.25 13:00 |
PART OF OLD SECTERIAT |
2 |
| 2 |
TATA POWER - DDL |
MANGOLPURI |
515 |
PREVENTIVE MAINTENANCE |
02.11.25 10:00 |
02.11.25 11:00 |
PART OF MANGOL PURI IND. AREA B -,T-2 BLKS. PARTIALY |
1 |
| 3 |
TATA POWER - DDL |
MANGOLPURI |
515 |
PREVENTIVE MAINTENANCE |
02.11.25 11:00 |
02.11.25 15:00 |
PART OF T-1 BLK PARTIALY MIA PHASE 01 |
4 |
| 4 |
TATA POWER - DDL |
BADLI |
507 |
PREVENTIVE MAINTENANCE |
03.11.25 10:00 |
03.11.25 13:00 |
PART OF SAMAIPUR |
3 |
| 5 |
TATA POWER - DDL |
BAWANA |
512 |
PROJECT WORK |
03.11.25 11:00 |
03.11.25 15:00 |
PART OF KATEWRA VILLAGE |
4 |
| 6 |
TATA POWER - DDL |
BAWANA |
521 |
PROJECT WORK |
03.11.25 11:00 |
03.11.25 15:00 |
PART OF POOTH IND AREA |
4 |
| 7 |
TATA POWER - DDL |
BAWANA |
533 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 15:00 |
PART OF KIA |
4 |
| 8 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
03.11.25 10:30 |
03.11.25 12:30 |
PART OF PUNJAB NATIONAL BANK APARTMENT |
2 |
| 9 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
03.11.25 14:00 |
03.11.25 16:00 |
PART OF SWISS APRTMENT |
2 |
| 10 |
TATA POWER - DDL |
KESAHAVPURAM |
502 |
PREVENTIVE MAINTENANCE |
03.11.25 08:00 |
03.11.25 11:00 |
PART OF WPIA |
3 |
| 11 |
TATA POWER - DDL |
KESAHAVPURAM |
509 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 13:00 |
PART OF ASHOK VIHAR PH-3 |
2 |
| 12 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 15:00 |
PART OF VINAY ENCLAVE |
4 |
| 13 |
TATA POWER - DDL |
KIRARI |
523 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 15:00 |
PART OF RAMESH ENCLAVE |
4 |
| 14 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 15:00 |
PART OF VILLAGE POOTHKALAN |
4 |
| 15 |
TATA POWER - DDL |
MODEL TOWN |
402 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 13:00 |
PART OF DERAWALA |
2 |
| 16 |
TATA POWER - DDL |
MODEL TOWN |
402 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 13:00 |
PART OF DERAWALA |
2 |
| 17 |
TATA POWER - DDL |
MODEL TOWN |
402 |
PREVENTIVE MAINTENANCE |
03.11.25 14:00 |
03.11.25 16:00 |
PART OF DERAWALA |
2 |
| 18 |
TATA POWER - DDL |
MODEL TOWN |
505 |
PREVENTIVE MAINTENANCE |
03.11.25 10:30 |
03.11.25 14:30 |
PART OF K-BLK |
4 |
| 19 |
TATA POWER - DDL |
MOTI NAGAR |
1301 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 15:00 |
PART OF 35,36 RAMA ROAD |
4 |
| 20 |
TATA POWER - DDL |
MOTI NAGAR |
1302 |
METERING WORK |
03.11.25 11:00 |
03.11.25 15:00 |
PART OF NARAINA IND. AREA PH-1 |
4 |
| 21 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 15:00 |
PART OF PREM NAGAR |
4 |
| 22 |
TATA POWER - DDL |
NARELA |
514 |
PREVENTIVE MAINTENANCE |
03.11.25 12:00 |
03.11.25 14:00 |
PART OF SABOLI ROAD |
2 |
| 23 |
TATA POWER - DDL |
NARELA |
514 |
PREVENTIVE MAINTENANCE |
03.11.25 14:00 |
03.11.25 16:00 |
PART OF SABOLI ROAD |
2 |
| 24 |
TATA POWER - DDL |
NARELA |
514 |
PREVENTIVE MAINTENANCE |
03.11.25 10:00 |
03.11.25 12:00 |
PART OF LAMPUR EXTENSION |
2 |
| 25 |
TATA POWER - DDL |
NARELA |
517 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 15:00 |
PART OF BAKOLI |
4 |
| 26 |
TATA POWER - DDL |
PITAMPURA |
508 |
PREVENTIVE MAINTENANCE |
03.11.25 10:30 |
03.11.25 14:30 |
PART OF JP, HP & KP BLOCK |
4 |
| 27 |
TATA POWER - DDL |
ROHINI |
551 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 13:00 |
PART OF MANGOLPUR KALAN |
2 |
| 28 |
TATA POWER - DDL |
ROHINI |
551 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 13:00 |
PART OF MANGOLULPUR KALAN |
2 |
| 29 |
TATA POWER - DDL |
SHALIMARBAGH |
503 |
PREVENTIVE MAINTENANCE |
03.11.25 11:00 |
03.11.25 13:00 |
PART OF SAMTA VIHAR |
2 |
| 30 |
TATA POWER - DDL |
SHALIMARBAGH |
503 |
PROJECT WORK |
03.11.25 12:00 |
03.11.25 16:00 |
PART OF JANTA VIHAR |
4 |
| 31 |
TATA POWER - DDL |
SHALIMARBAGH |
532 |
PREVENTIVE MAINTENANCE |
03.12.25 10:30 |
03.12.25 13:30 |
PART OF HARIZAN BASTI |
3 |
| 32 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
04.11.25 06:00 |
04.11.25 09:00 |
PART OF D BLK SEC 5 |
3 |
| 33 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
04.11.25 06:00 |
04.11.25 09:00 |
PART OF K BLK SEC 2 |
3 |
| 34 |
TATA POWER - DDL |
NARELA |
522 |
PREVENTIVE MAINTENANCE |
04.11.25 07:00 |
04.11.25 09:30 |
PART OF A-1 TO A-34 |
2 |
| 35 |
TATA POWER - DDL |
MOTI NAGAR |
1301 |
PREVENTIVE MAINTENANCE |
04.11.25 09:00 |
04.11.25 13:00 |
PART OF FURNITURE MARKET& G BLOCK EXTENTION |
4 |
| 36 |
TATA POWER - DDL |
MOTI NAGAR |
1304 |
PREVENTIVE MAINTENANCE |
04.11.25 10:30 |
04.11.25 13:30 |
PART OF F BLK JJ COLONY INDERPURI |
3 |
| 37 |
TATA POWER - DDL |
BAWANA |
512 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 15:00 |
PART OF JKLM BLK JJ COLONY BAWANA |
4 |
| 38 |
TATA POWER - DDL |
BAWANA |
533 |
PROJECT WORK |
04.11.25 11:00 |
04.11.25 13:00 |
PART OF JAUNTI |
2 |
| 39 |
TATA POWER - DDL |
BAWANA |
533 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 15:00 |
PART OF JAUNTI AGRICULTURAL AREA |
4 |
| 40 |
TATA POWER - DDL |
CIVIL LINES |
418 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 14:00 |
PART OF MALL ROAD |
3 |
| 41 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
04.11.25 11:00 |
04.11.25 15:00 |
PART OF MEER VIHAR |
4 |
| 42 |
TATA POWER - DDL |
KIRARI |
523 |
PROJECT WORK |
04.11.25 11:00 |
04.11.25 15:00 |
PART OF KARAN VIHAR |
4 |
| 43 |
TATA POWER - DDL |
MANGOLPURI |
515 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 13:00 |
PART OF E BLK MIA |
2 |
| 44 |
TATA POWER - DDL |
MANGOLPURI |
518 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 15:00 |
PART OF RAJ PARK PARTIALY , HARIZEN BSTI PARTIALY |
4 |
| 45 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 13:00 |
PART OF BEGUMPUR |
2 |
| 46 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 15:00 |
PART OF PKT-9 SEC-21 |
4 |
| 47 |
TATA POWER - DDL |
MOTI NAGAR |
1303 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 12:00 |
PART OF CHUNNA BATTI SUB/STATION |
1 |
| 48 |
TATA POWER - DDL |
MOTI NAGAR |
1304 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 13:00 |
PART OF E BLK JJ COLONY INDERPURI |
2 |
| 49 |
TATA POWER - DDL |
NARELA |
514 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 13:00 |
PART OF MARKET/GAUTM COLONY |
2 |
| 50 |
TATA POWER - DDL |
NARELA |
514 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 13:00 |
PART OF NARELA MARKET/ GAUTAM COLONY |
2 |
| 51 |
TATA POWER - DDL |
NARELA |
514 |
PROJECT WORK |
04.11.25 11:00 |
04.11.25 15:00 |
PART OF OJ JJ CLUSTER GAUTAM COLONY |
4 |
| 52 |
TATA POWER - DDL |
NARELA |
517 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 15:00 |
PART OF BAKOLI |
4 |
| 53 |
TATA POWER - DDL |
NARELA |
522 |
PREVENTIVE MAINTENANCE |
04.11.25 11:00 |
04.11.25 15:00 |
PART OF H 1436 TO H 1463 |
4 |
| 54 |
TATA POWER - DDL |
BAWANA |
533 |
METERING WORK |
04.11.25 11:30 |
04.11.25 13:30 |
PART OF FCI GHEVRA |
2 |
| 55 |
TATA POWER - DDL |
MANGOLPURI |
518 |
PREVENTIVE MAINTENANCE |
04.11.25 11:30 |
04.11.25 15:30 |
PART OF P4 SP |
4 |
| 56 |
TATA POWER - DDL |
KIRARI |
523 |
PREVENTIVE MAINTENANCE |
04.11.25 12:00 |
04.11.25 16:00 |
PART OF LAXMI VIHAR |
4 |
| 57 |
TATA POWER - DDL |
KIRARI |
523 |
PREVENTIVE MAINTENANCE |
04.11.25 12:00 |
04.11.25 16:00 |
PART OF KARAN VIHAR |
4 |
| 58 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
04.11.25 13:00 |
04.11.25 15:00 |
PART OF MUBARAKPUR |
2 |
| 59 |
TATA POWER - DDL |
CIVIL LINES |
418 |
PREVENTIVE MAINTENANCE |
04.11.25 14:00 |
04.11.25 16:00 |
PART OF NEHRU VIHAR SEWAGE PUMP |
2 |
| 60 |
TATA POWER - DDL |
KIRARI |
523 |
PREVENTIVE MAINTENANCE |
04.11.25 14:00 |
04.11.25 16:00 |
PART OF KIRARI VILLAGE |
2 |
| 61 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
04.11.25 14:00 |
04.11.25 16:00 |
PART OF BEGUMPUR |
2 |
| 62 |
TATA POWER - DDL |
NARELA |
514 |
PREVENTIVE MAINTENANCE |
04.11.25 14:00 |
04.11.25 16:00 |
PART OF NARELA MARKET |
2 |
| 63 |
TATA POWER - DDL |
KESAHAVPURAM |
422 |
PREVENTIVE MAINTENANCE |
05.11.25 11:00 |
05.11.25 12:00 |
PART OF SZB INDL AREA |
1 |
| 64 |
TATA POWER - DDL |
KESAHAVPURAM |
509 |
PREVENTIVE MAINTENANCE |
05.11.25 11:30 |
05.11.25 15:30 |
PART OF B-68 SIDE HVDS |
4 |
| 65 |
TATA POWER - DDL |
KESAHAVPURAM |
502 |
PREVENTIVE MAINTENANCE |
06.11.25 08:00 |
06.11.25 10:00 |
PART OF WPIA |
2 |
| 66 |
TATA POWER - DDL |
BADLI |
572 |
PROJECT WORK |
06.11.25 10:00 |
06.11.25 16:00 |
PART OF ALIPUR INDUSTRIAL AREA ) |
6 |
| 67 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
06.11.25 10:30 |
06.11.25 12:30 |
PART OF ALIPUR ROAD |
2 |
| 68 |
TATA POWER - DDL |
MODEL TOWN |
505 |
PREVENTIVE MAINTENANCE |
06.11.25 10:30 |
06.11.25 12:30 |
PART OF JAHANGIR PURI |
2 |
| 69 |
TATA POWER - DDL |
MOTI NAGAR |
1301 |
PREVENTIVE MAINTENANCE |
06.11.25 10:30 |
06.11.25 13:30 |
PART OF18 DLF MOTINAGAR |
3 |
| 70 |
TATA POWER - DDL |
MOTI NAGAR |
1304 |
PREVENTIVE MAINTENANCE |
06.11.25 10:30 |
06.11.25 12:30 |
PART OF F BLK JJ COLONY |
2 |
| 71 |
TATA POWER - DDL |
BAWANA |
533 |
PROJECT WORK |
06.11.25 11:00 |
06.11.25 15:00 |
PART OF BULLA COLONY |
4 |
| 72 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
06.11.25 11:00 |
06.11.25 15:00 |
PART OF AGAR NAGAR |
4 |
| 73 |
TATA POWER - DDL |
MANGOLPURI |
518 |
PREVENTIVE MAINTENANCE |
06.11.25 11:00 |
06.11.25 15:00 |
PART OF P-4 SULTANPURI |
4 |
| 74 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
06.11.25 11:00 |
06.11.25 13:00 |
PART OF BEGUMPUR |
2 |
| 75 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
06.11.25 11:00 |
06.11.25 15:00 |
PART OF BUDH VIHAR PH-2 |
4 |
| 76 |
TATA POWER - DDL |
SHALIMARBAGH |
532 |
PREVENTIVE MAINTENANCE |
06.11.25 11:00 |
06.11.25 15:00 |
PART OF SANT NAGAR |
4 |
| 77 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
06.11.25 14:00 |
06.11.25 16:00 |
PART OF UNDER HILL ROAD |
2 |
| 78 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
06.11.25 14:00 |
06.11.25 16:00 |
PART OF MANGE RAM PARK |
2 |
| 79 |
TATA POWER - DDL |
MODEL TOWN |
505 |
|
06.11.25 14:00 |
06.11.25 16:00 |
PART OF JAHANGIR PURI |
2 |
| 80 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
07.11.25 10:30 |
07.11.25 12:30 |
PART OF DMRC FLATS |
2 |
| 81 |
TATA POWER - DDL |
BAWANA |
533 |
PREVENTIVE MAINTENANCE |
07.11.25 11:00 |
07.11.25 15:00 |
PART OF CHANDPUR VILLAGE |
4 |
| 82 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
07.11.25 11:00 |
07.11.25 15:00 |
PART OF VIDYAPTI NAGAR |
4 |
| 83 |
TATA POWER - DDL |
MANGOLPURI |
518 |
PREVENTIVE MAINTENANCE |
07.11.25 11:00 |
17.11.25 15:00 |
PART OF P4 SULTANPURI |
244 |
| 84 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
07.11.25 11:00 |
07.11.25 13:00 |
PART OF BUDH VIHAR |
2 |
| 85 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
07.11.25 12:00 |
07.11.25 16:00 |
PART OF CNG STATION SEC-21 |
4 |
| 86 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
07.11.25 14:00 |
07.11.25 16:00 |
PART OF VISWA APARTMENTS |
2 |
| 87 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
07.11.25 14:00 |
07.11.25 16:00 |
PART OF BUDH VIHAR |
2 |
| 88 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
08.11.25 10:00 |
08.11.25 16:00 |
PART OF GALI NO 5 JAIN NAGAR |
6 |
| 89 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
08.11.25 10:30 |
08.11.25 12:30 |
PART OF CNG PUMP |
2 |
| 90 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
08.11.25 11:00 |
08.11.25 13:00 |
PART OF O,L AND H BLK SEC 3 |
2 |
| 91 |
TATA POWER - DDL |
MANGOLPURI |
518 |
PREVENTIVE MAINTENANCE |
08.11.25 11:30 |
08.11.25 15:30 |
PART OF D-5 SULTANPURI |
4 |
| 92 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
08.11.25 12:00 |
08.11.25 16:00 |
PART OF CNG SEC-23 |
4 |
| 93 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
10.11.25 11:00 |
10.11.25 15:00 |
PART OF SUKHBIR NAGAR |
4 |
| 94 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
10.11.25 11:00 |
10.11.25 13:00 |
PART OF RAJEEV NAGAR |
2 |
| 95 |
TATA POWER - DDL |
MANGOLPURI |
518 |
PREVENTIVE MAINTENANCE |
10.11.25 11:30 |
10.11.25 15:30 |
PART OF D-5 |
4 |
| 96 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
10.11.25 12:00 |
10.11.25 16:00 |
PART OF CNG SEC-22 |
4 |
| 97 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
10.11.25 14:00 |
10.11.25 16:00 |
PART OF RAJEEV NAGAR |
2 |
| 98 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
11.11.25 11:00 |
11.11.25 15:00 |
PART OF GALI NO 6 JAIN NAGAR |
4 |
| 99 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
11.11.25 11:00 |
11.11.25 13:00 |
PART OF BUDH VIHAR |
2 |
| 100 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
11.11.25 14:00 |
11.11.25 16:00 |
PART OF SEC-20 ROHINI |
2 |
| 101 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
12.11.25 11:00 |
12.11.25 15:00 |
PART OF RANIKHERA |
4 |
| 102 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
13.11.25 10:00 |
13.11.25 14:00 |
PART OF GALI NO 6 JAIN NAGAR |
4 |
| 103 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
13.11.25 13:00 |
13.11.25 16:00 |
PART OF GALI NO 6 JAIN NAGAR |
3 |
| 104 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
14.11.25 11:00 |
14.11.25 15:00 |
PART OF GALI NO 6 JAIN NAGAR |
4 |
| 105 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
17.11.25 11:00 |
17.11.25 15:00 |
PART OF AGAR NAGAR |
4 |
| 106 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
18.11.25 11:00 |
18.11.25 15:00 |
PART OF GALI NO 6 JAIN NAGAR |
4 |
| 107 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
19.11.25 11:00 |
19.11.25 14:00 |
PART OF RAMA VIHAR |
3 |
| 108 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
20.11.25 13:00 |
20.11.25 16:00 |
PART OF RAMA VIHAR |
3 |
| 109 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
23.11.25 11:00 |
23.11.25 15:00 |
PART OF PKT C1 ESS 8 SEC-37 |
4 |
| 110 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
24.11.25 11:00 |
24.11.25 15:00 |
PART OF VIDYAPATI NAGAR |
4 |
| 111 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
27.11.25 11:00 |
27.11.25 15:00 |
PART OF MADANPUR |
4 |
| 112 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
28.11.25 11:00 |
28.11.25 15:00 |
PART OF RANIKHERA |
4 |
| 113 |
TATA POWER - DDL |
ROHINI |
551 |
PREVENTIVE MAINTENANCE |
30.11.25 11:00 |
30.11.25 15:00 |
PART OF VIJAY VIHAR-2 |
4 |